Egg Processing

0095-2

Texas Egg Processing Facility

Project Description:

  • Build process for optimized facility cost, operational efficiency, and employee performance
  • Egg Processing, cold storage, dry storage, and employee area
  • 55,265 total square feet
  • 550 case per hour egg grader 
  • USDA and SQF compliant
  • Fire-Life Safety and ADA consideration and compliance
  • Proprietary egg drying closed-loop dehumidification system for mold prevention and optimized processing
  • Water-injected soil stabilization
  • Insulated metal panel cladding with chemical resistant epoxy flooring 
0095-2
TODD 10-154-17 flt2414-003

Arizona Egg Process Facility

Project Description:

  • Fully turn-key for optimized facility cost, operational efficiency, and employee performance
  • Egg processing, cooled temporary loading zone, and employee area
  • 34,300 total square feet
  • 700 case per hour egg grader
  • Fire-Life Safety, ADA, USDA and SQF compliance 
  • Designed for all relevant codes and permit requirements
  • Proprietary egg drying closed-loop dehumidification system for mold prevention and optimized processing
TODD 10-154-17 flt2414-003
20190306_105924

Florida Cold Storage Addition

Project Description: 

  • 15,408 total square shell egg cold storage addition
     
  • Turn-key structural, mechanical, electrical, plumbing and refrigeration scope
     
  • Insulated metal wall and roof panels
     
  • Connecting corridor to existing building
20190306_105924
20180522_170116

South Carolina Dry Storage

Project Description: 

  • 36,000 total square foot shell egg dry storage addition
     
  • Turn-key structural, mechanical and electrical
     
  • Connecting corridor to existing building
20180522_170116
Egg house

Utah Egg Process Facility

Project Description: 

  • Fully turn-key for optimized facility cost, operational efficiency, and employee performance
  • Egg processing, cold storage, dry storage, and employee area
  • 61,000 total square feet
  • Capacity: 700 cases per hour
  • Fire-Life Safety, ADA, USDA and SQF compliance 
  • Designed for all relevant codes and permit requirements
  • Proprietary egg drying closed-loop dehumidification system for mold prevention and optimized processing
Egg house
3-4

Egg Cold-Storage Facility Design

Project Description: 

  • Full Design and Engineering of Architectural, Structural, Mechanical, Electrical, and Plumbing
     
  • 56,000 total square feet
     
  • Fire-Life Safety, ADA, USDA and SQF compliance
     
  • Designed for all relevant codes and permit requirements
3-4
RAF_-2

Northern Indiana Egg Cooler

Project Description: 

  • 11,360 total square foot shell egg cooler addition
     
  • Insulated metal wall and ceiling panels
     
  • Connecting corridor to existing building
RAF_-2

dehumidification solution

Egg producers fight a constant battle to control humidity, mold, and energy cost during the egg washing and drying process

Summit

We Have a Building Solution for You

We provide high quality, proven options so you can choose what’s best for your business and overall investment.